New opportunities from an obsolete plant
The plant, no longer in operation since 2013 and secured in 2015, consisted of two incineration lines, the first started in 1988, the second in 1996, each consisting of a waste incineration and heat recovery system, a flue gas cleaning section and a thermal cycle for energy production. The work was carried out without any obstruction to the new plant, which is adjacent to the construction site, so as to ensure the continuous operation of the new waste-to-energy plant, the viability along the Brenner Motorway and via Lungo Isarco Sinistro, and access to the workforce to the Seab warehouses.