A new road surface to ensure quality and durability
The Vitali Group has carried out maintenance work on the pavement of the Brenner motorway in the Brenner-Rovereto Nord section.
The work, which covered the entire roadway, was divided into lots and consisted in the deep milling of the existing pavement and the complete repaving of the same with laying of sound-absorbing asphalt specially designed to allow high quality standards and a high degree of durability.
Duration of works
20 days



