Zingonia Towers

An initiative against urban decay

The demolition of the Zingonia Towers entrusted to the Vitali Group by ILSPA (Infrastrutture Lombarde) saw us at work between May and June 2019.

In a month and a half, the 6 buildings that had been places marked by decay and squatting for years were demolished. Only 50 days to make a clean slate of the Anna and Athena complexes. Rubble removal works are underway now, but we can still speak of a real record if we consider that the timeframe, from the announcement, was 270 days to carry out the works. The construction site covered an area of about 20,000 sq. m. A total of 6 buildings of 9 floors each for a height of about 30 mt. In total, this is about 53,700 cu m above ground and 8,300 cu m within ground.

Demolished volume 62,000 m³
Demolished area 20,000 sqm
Buildings 6