An initiative against urban decay
The demolition of the Zingonia Towers entrusted to the Vitali Group by ILSPA (Infrastrutture Lombarde) saw us at work between May and June 2019.
In a month and a half, the 6 buildings that had been places marked by decay and squatting for years were demolished. Only 50 days to make a clean slate of the Anna and Athena complexes. Rubble removal works are underway now, but we can still speak of a real record if we consider that the timeframe, from the announcement, was 270 days to carry out the works. The construction site covered an area of about 20,000 sq. m. A total of 6 buildings of 9 floors each for a height of about 30 mt. In total, this is about 53,700 cu m above ground and 8,300 cu m within ground.
Demolished volume
62,000 m³
Demolished area
20,000 sqm
Buildings
6