Wine Logistic Platform

Logistics supporting port activities

The operation involved the construction of a logistics warehouse of c.a. 10,000 sq.m. inside the Collesalvetti interport, located about 7 kilometers from the port of Livorno, in an area with high accessibility characterized by the presence of important services for transport intermodality.

The logistics building, built for the company Giorgio Gori srl, consists of a large warehouse space for the storage of fine wines and spirits, as well as office space, dressing rooms and related service spaces. The construction of the work was particularly challenging from an engineering point of view because the entire interport is located in an area where, in the past, there were marshy areas, now reclaimed.

Preliminary soil consolidation work, which involved the construction of hundreds of subfoundation piles using the jet grouting technique, turned out to be of fundamental importance; on the soil thus perfectly stabilized it was possible to construct the building.

SLP 10,900 sqm
Lot Area 65,000 sqm
Green Area 8.300 sqm
Design studio Tecni Studio IBC – Ing. Paolo Bertie Geom. Marcello Puccinie Studio associate Previtali A.
Back to top